Interior Fit Out Companies in Dubai

Kat Black Design Studio is a full-service interior fit-out company in Dubai providing residential and commercial fit-out services across every handover condition, from Shell and Core and Category A base-build works through to Category B tenant fit-outs, luxury villa and apartment fit-outs, restaurant and F&B fit-outs and specialist commercial interiors across all of Dubai’s major residential communities and commercial districts. Interior fit-out in Dubai is a technically regulated, programme-sensitive discipline that requires a licensed contractor, compliance with Dubai Municipality (DM) and DEWA regulatory frameworks, and the project management capability to deliver a complex multi-trade construction programme against a deadline fixed by a lease commencement date, an off-plan handover or an operator’s opening campaign. Kat Black Design Studio provides all of this under a single contract, with one project manager throughout and one team responsible for design, compliance, procurement and construction delivery from the first consultation to the handover walkthrough.

What is Interior Fit Out?

Interior fit-out is the process of transforming a building space from its base or shell condition into a completed, furnished and operational interior. The term covers every physical element installed within the building envelope after the structural works are complete: partitioning, suspended ceilings, flooring, all mechanical and electrical services, joinery and fitted furniture, kitchen and bathroom installations, painting and decorating, smart home or building management systems, window treatments and final furniture placement.

In Dubai’s property market, fit-out applies equally to residential and commercial contexts. A newly handed-over bare-shell villa in Dubai Hills Estate requires a complete residential fit-out to become a liveable home. A Category A commercial office floor in DIFC requires a Category B tenant fit-out to become an operational workspace. A retail unit in Dubai Mall requires a brand-specific fit-out to become a trading store. In every case, the fit-out is the largest and most complex phase of the property development journey for the end user, and the quality of the fit-out company chosen to deliver it determines the outcome.

01.

Stage 1: Consultation and Survey

A free initial consultation at the property with a senior designer and project manager. The scope is discussed, the base-build condition is surveyed, regulatory requirements are assessed and a written scope summary is issued within 48 hours. No fee is charged for the initial consultation and survey.

02.

Stage 2: Design and 3D Visualisation

Full design development covering spatial planning, material palette, joinery layouts, lighting strategy and all technical coordination. Photorealistic 3D renders are produced for all principal spaces and issued to the client for approval before any physical works are procured. Amendments are incorporated until the design is approved.

03.

Stage 3: Permit and Procurement

All permit applications (DM structural permit, Emaar NOC, DEWA, DCD, DHA or DTCM as applicable to the specific project) are initiated immediately on design approval. Material and joinery procurement is placed against confirmed lead times. Sub-contractor selection is completed and the construction programme is issued to the client for approval.

04.

Stage 4: Fit-Out Execution

Physical works commence on site under the management of the dedicated project manager. Weekly written progress reports are issued to the client covering completed works, upcoming programme and any issues requiring client decision. Works proceed in the standard construction sequence: structural and MEP first fix, partitioning, ceiling, MEP second fix, flooring, joinery, painting, smart home, window treatments, furniture delivery and positioning.

05.

Stage 5: Snagging and Handover

The project manager conducts a comprehensive pre-handover snagging inspection and resolves all items before the client walkthrough. The formal handover includes a complete documentation pack covering all MEP compliance certificates, permit sign-off documents, warranty records, material maintenance guides and smart home user documentation.

1
5

A free initial consultation at the property with a senior designer and project manager. The scope is discussed, the base-build condition is surveyed, regulatory requirements are assessed and a written scope summary is issued within 48 hours. No fee is charged for the initial consultation and survey.

Full design development covering spatial planning, material palette, joinery layouts, lighting strategy and all technical coordination. Photorealistic 3D renders are produced for all principal spaces and issued to the client for approval before any physical works are procured. Amendments are incorporated until the design is approved.

All permit applications (DM structural permit, Emaar NOC, DEWA, DCD, DHA or DTCM as applicable to the specific project) are initiated immediately on design approval. Material and joinery procurement is placed against confirmed lead times. Sub-contractor selection is completed and the construction programme is issued to the client for approval.

Physical works commence on site under the management of the dedicated project manager. Weekly written progress reports are issued to the client covering completed works, upcoming programme and any issues requiring client decision. Works proceed in the standard construction sequence: structural and MEP first fix, partitioning, ceiling, MEP second fix, flooring, joinery, painting, smart home, window treatments, furniture delivery and positioning.

The project manager conducts a comprehensive pre-handover snagging inspection and resolves all items before the client walkthrough. The formal handover includes a complete documentation pack covering all MEP compliance certificates, permit sign-off documents, warranty records, material maintenance guides and smart home user documentation.

Our Expertise

Shell & Core

A Shell and Core building is the most elemental handover condition in Dubai’s property market. The developer delivers the structural frame, external envelope, core services risers and base MEP to the building’s floor plates, with no internal partitioning, no ceiling, no internal MEP distribution and no finishes of any kind within the tenant or owner’s space. Shell and Core is the standard handover condition for standalone commercial buildings, industrial units, some retail spaces and a small number of residential developments where the developer chooses to offer maximum specification flexibility to the buyer.

A Shell and Core fit-out requires the largest and most technically complex scope of work: the complete internal MEP distribution must be designed and installed from the building’s riser connections, the structural slab must receive its floor build-up, the full internal partitioning system must be built from scratch, the suspended ceiling must be installed and all finishes applied from bare concrete walls. For a commercial building, a Shell and Core fit-out encompasses both the Category A and Category B scope. For a residential property, it encompasses the equivalent of a complete fit-out from concrete shell to furnished home. Kat Black Design Studio delivers Shell and Core fit-outs for both commercial and residential applications, managing the full MEP design coordination with the building’s structural and services engineers.

Design

Category A Fit Out

Category A fit-out transforms a Shell and Core commercial space into a base-build ready condition for tenant occupation. The scope covers the complete internal MEP distribution (HVAC ductwork and diffusers, sprinkler system, fire detection, power and lighting to floor plate level), raised access flooring, suspended ceiling grid and tiles, perimeter skirting, common area and toilet core finishes and the main distribution board with power metered to the tenant’s incoming supply point. A Category A fit-out does not include any tenant-specific partitioning, bespoke joinery, data infrastructure, AV or furniture. These are all Category B scope items.

Category A fit-outs in Dubai are typically commissioned by developers or landlords who are preparing a commercial building for the leasing market. Kat Black Design Studio undertakes Category A fit-out contracts for commercial landlords and developers across DIFC, Business Bay, Sheikh Zayed Road, JLT and Al Quoz.

1
3

Design

Category B Fit Out

Category B fit-out transforms a Category A office space into a fully operational, furnished and branded workplace for the specific tenant. This is the fit-out that the commercial tenant commissions and it is the most design-intensive and commercially significant element of the office fit-out journey. Category B scope at Kat Black Design Studio covers demountable full-height partitioning for all rooms and offices, ceiling modifications and feature ceiling elements, flooring upgrades (carpet tile, LVT or engineered timber), all MEP second-fix to serve the fitted layout, bespoke joinery including reception desk and kitchen cabinetry, audio-visual systems in meeting rooms, data cabling infrastructure and all furniture from workstations to boardroom tables.

All Category B MEP works are executed by DEWA-licensed contractors and signed off by DEWA before client handover. Structural modifications, where required, are managed through the DM permit process. Kat Black Design Studio manages all regulatory compliance as a standard part of every Category B commission.

Start Your Journey Today

Are you ready?

Frequently Asked Questions

Frequently Asked Questions About Interior Fit Out

What does interior fit out include in Dubai?

Interior fit-out in Dubai covers all works required to transform a property from its base or shell condition into a completed, operational interior. This includes structural modifications, gypsum partitioning and ceiling works, all MEP services (electrical, HVAC, plumbing and smart home systems), flooring across all material types, kitchen and bathroom fit-out, bespoke joinery and fitted furniture, painting and decorating, window treatments and final furniture placement. The specific scope depends on the handover condition of the property and the client’s brief.

Who are the best interior fit-out companies in Dubai?

The best interior fit-out companies in Dubai are those that combine genuine design capability with licensed contracting expertise, regulatory compliance knowledge and programme management discipline under a single contract. Kat Black Design Studio is a full-service design and fit-out studio with a completed portfolio across luxury villas, premium apartments, commercial offices in DIFC and Business Bay, restaurants and F&B, retail and healthcare facilities. The studio manages all required DM, DEWA, DCD, DHA and Emaar compliance for every project as a standard part of the service.

How long does interior fit out take in Dubai?

Interior fit-out timelines in Dubai depend on the property type and scope. A bare-shell apartment fit-out of one to two bedrooms typically takes 10 to 16 weeks. A four-bedroom villa fit-out typically takes 14 to 22 weeks. A Category B commercial office fit-out of 1,000 to 3,000 square feet typically takes 12 to 16 weeks. A restaurant fit-out typically takes 14 to 20 weeks including the DCD approval process. All programmes are set against the client’s required completion date from the first briefing session.

How much does interior fit out cost in Dubai?

Interior fit-out costs in Dubai vary significantly by property type, scope and specification level. A residential apartment fit-out from bare shell ranges from AED 120,000 for a one-bedroom at a standard specification to AED 800,000 or more for a three-bedroom luxury apartment. A villa fit-out ranges from AED 400,000 for a four-bedroom at mid-range specification to AED 3,000,000 or more for an ultra-luxury Emirates Hills or Palm Jumeirah property. Commercial office fit-out ranges from AED 250 to AED 800 per square foot depending on specification. Kat Black Design Studio provides a detailed cost proposal following the free initial consultation.

Does Kat Black Design Studio handle all permits for fit-out projects in Dubai?

Yes. All required permits and regulatory approvals are managed by Kat Black Design Studio as a standard part of every fit-out commission. This includes DM structural permits, Emaar community NOC applications, DEWA compliance for all MEP installations, DCD approval for F&B and hospitality fit-outs, DHA compliance for healthcare and beauty treatment facilities and DTCM compliance for hotel properties. Clients do not engage with any of these authorities directly.

What is the difference between Shell and Core, Category A and Category B fit out?

Shell and Core is the most elemental condition: the structural frame and external envelope only, with no internal MEP distribution or finishes. Category A is the base-build standard delivered by the landlord, covering internal MEP to floor plate level, raised access flooring, suspended ceiling and base finishes. Category B is the tenant’s fit-out of the Category A space to create their specific workplace, covering all partitioning, bespoke joinery, MEP second-fix, AV and furniture. Residential fit-out from bare shell is equivalent in scope to a combined Shell and Core plus Category A and B delivery for the home.

Request a Free Consultation

Kat Black Design Studio has completed projects across Dubai Hills Estate, Palm Jumeirah, Emirates Hills, DIFC and beyond. If you are ready to discuss your interior design, renovation, fit-out or landscaping project anywhere in Dubai or the UAE, request a complimentary consultation today, with no obligation.

Or contact us directly via WhatsApp. All enquiries receive a response within two business hours.